I am reducing a block diagram manually and am not sure whether the following step is a valid step? I am using the rule of moving a summing ahead of a block in reverse.
I've checked the resulting transfer function before and after this step using MATLAB (connect function and Linear Analysis in Simulink) and they aren't the same, leading me to believe this isn't a valid step.
Any help is greatly appreciated.